Christmas opening times 2024: We are closed to all but essential services over the Christmas period. You can still use our online services to report, apply and pay 24/7.
Faults with bridges, subways and retaining walls
Tell us if you see a problem with a bridge, subway or retaining wall.
As part of the Streets Ahead works, we are inspecting, repairing and strengthening the bridges and structures we own across the city. In addition to this, we also inspect every road structure across the city every 2 years in line with national standards.
This allows us to plan the maintenance work needed to keep them safe and functional. If you have noticed any faults with bridges, subways or retaining walls please report it to us as soon as possible.
Heavy vehicle routes
Contact us for routing advice for heavy abnormal vehicles through Sheffield.